Exterior:
Lite landscaping in front
Clean up back
Possible stucco (or repair siding)
Paint/repair gutters, facia, trim
Replace, repair screen doors
Remove roof from back deck awning, remove frame around porch area, install matching rail on south side
Stain/repair deck/stairs
Possible new roof
New electrical box
Interior:
New doors throughout
Drywall/patch where needed, paint
Remove ceiling throughout due to wildlife damage, replace insulation
Sand/stain woods floor throughout
New lighting fixtures throughout
New outlets/faceplates throughout
New base boards throughout
Check attic fan functionality
Kitchen:
Gut, new cabinets, new counters, new sink, some electrical
Remove soffit/tray ceiling, downsize/reroute ductwork in front area
New tile/wood floors
Dress up stairway area leading to garage
Install appliances
Living Room:
Paint wood beam, stair railing, corner cabinet, fireplace
Hallway:
Remove wallpaper
Trim/clean up closet
Bathroom/main:
New Tile, new wall texture, new toilet, possibly new bath, plumbing, new mirror, new vanity
Master Bedroom;
New tile in bathroom, new vanity, hang mirror, new toilet, possibly new shower
Clean/trim closet
NE Bedroom:
Repair ceiling
Clean/trim up closet
E Bedroom:
Paint wayne’s coating and wood shelves, remove wallpaper
Basement: (according to Charles’s specifications and design)
Build bathroom, plumbing, electrical, install fixtures
Build 2 bedrooms, electrical
Living room, electrical
Utility area
New water heater
Inspect furnace
Install carpet
Garage:
Drywall where needed, possibly replace garage door
You must log in to post a comment.